Your new home. Approved and ready to build.

NSW council averages 77 days. We take 10–14.

"Council told us our project was non-complying and we would need a DA - an 18-month process. Our certifier approved it as CDC in 12 days."

In NSW, you cannot legally begin construction on a new home without either a CDC or a CC - and every day waiting costs you in finance and holding charges.

  • CDC issued privately - no council, no public exhibition period
  • CC issued with full BCA and NCC compliance review in one step
  • BASIX certificate, soil report, and engineering checked before you mobilise

Eligibility Check

Does your new home qualify for a fast CDC?

Select all that apply to your project.

Tick each criterion that applies to your project

Your project likely qualifies for a fast CDC.

No council. No delays.

Get your free quote

You missed a few requirements.

Based on your selection, your project might require an alternative approval pathway (like a DA). You are missing:

  • Located in New South Wales
  • Lot size over 450sqm (or 300sqm in SEPP compliant zones)
  • Building height under 8.5m
  • Setbacks comply with SEPP Housing 2021 - not a custom DCP
  • Not in a heritage conservation area
  • Not on flood-prone or high bush-fire risk land

Don't worry, we've got you.

Our experts can counsel you on alternative pathways and guide you through the process. Call us immediately for a free consultation.

Call 0421 936 489

From signed drawings to a build-ready certificate.

Typical Class 1a CDC or CC issued in 10–14 business days.

  1. Day 1

    Submit Plans

    Upload your architectural drawings, site plan, BASIX certificate, and soil report.

  2. Days 1–5

    BCA & NCC Review

    We check energy compliance, setbacks, height limits, and fire safety requirements.

  3. Days 5–10

    Any Conditions Issued

    Minor conditions resolved quickly - we contact you directly, not via council.

  4. Day 10–14

    Certificate Issued

    CDC or CC signed. Your builder can mobilise and begin excavation immediately.

  5. During Build

    Stage Inspections

    We attend pre-slab, frame, waterproofing, and insulation stages on one schedule.

  6. Completion

    Occupation Certificate

    Final on-site inspection. OC issued. You can legally occupy your new home.

Have a question about the process? Call us - we're happy to walk you through it.

Scope of Works

Residential Certification Services

Expert guidance and fast approvals to get your residential project out of the ground sooner.

Complying Development (CDC)

Bypass council DA delays. We assess and approve Complying Development Certificates rapidly.

Perfect for new homes, duplexes & granny flats
Approval typically in 10–15 business days
We handle all government portal lodgements
Free initial eligibility consultation
Independent expert assessmentGet a quote
Complying Development (CDC)

Ready to get started?

Get a fast-tracked quote from a licensed NSW certifier. Most clients hear back within 2 hours.

Request a Quote

Select your project type

See the exact documents needed. No guesswork, no endless lists.

Architectural Drawings

Floor plans, elevations, sections - from your architect or draftsperson

Site / Survey Plan

From your licensed surveyor - showing boundaries and levels

BASIX Certificate

Energy efficiency certificate - mandatory for all NSW homes

Soil Investigation Report

Geotechnical report for footing design

Structural Engineering Report

Certified by a practising engineer

Hydraulic / Drainage Plan

Stormwater management design

Missing something? Don't worry — we can help source it.

Start your application

Where We Provide This Service

No.1 Building Services provides fast, unrestricted certification across the following regions. Explore our interactive coverage map.

South West SydneyGreater Western & North West SydneyCity & Inner WestParramatta & Central WestNorthern & BeachesEastern SuburbsSt George & SutherlandNewcastle & The Lower Hunter
Loading coverage map...

Unrestricted Authority

Certification Capabilities

Recent Single Dwellings & New Homes we've certified

High-rise residential tower certification capabilities

Class 2 - Residential

High-Rise Residential Towers

Approvals typically in ~35 days

Custom home Complying Development Certificate capabilities

Class 1 & 2 - Residential

Custom Luxury Homes & Duplexes

CDCs typically in ~14 days

Residential swimming pool compliance capabilities

Class 10b - Residential

Swimming Pools & Minor Structures

CDCs typically in ~5 days

New home certification - your questions answered.

Yes, if your site and design qualify for CDC. A CDC can avoid the full DA process, but NSW Planning Portal, notification and other approvals may still apply.

A CDC combines planning and construction approval for eligible work. A CC is construction approval issued after a DA has already been approved.

We typically issue single-dwelling CDCs within 10-14 business days after receiving complete and compliant documents. Timing depends on site constraints, notifications and further information.

BASIX is a NSW sustainability certificate covering water, energy and thermal performance. You generally need it for new residential development.

Usually, yes. A soil or geotechnical report helps the engineer design suitable footings for the site.

Get in touch

Request a quote

We'll review your project details and get back to you within 24 hours.

Building certifier inspecting blueprints

Unrestricted certifiers

Your project is reviewed directly by NSW-accredited certifiers - no middlemen.